CEMEX
Sunol, California
Trommel Screen
Increase sand production. Design #4 mesh opening window-frame rubber sand screens.
Winter 2010
Lehigh Southwest Cement
Redding, California
Upgrade Chute System
Design, engineer, manufacture and supply new storage dome reclaim transfer chute and conveyor canoe system.
Winter 2010
Newmont Mining
Battle Mountain, Nevada
Upgrade 800 TPH Feeders
Design, engineer, manufacture and supervise installation of three feeder system upgrades to increase belt and liner wearlife.
Spring 2010
Lehigh Southwest Cement
Tehachapi, California
Replace Roller Mill Belt Feeder System
Design, engineer, manufacture and supply new air-tight 250 TPH belt feeder.
Fall-Winter 2009
Lehigh Southwest Cement
Tehachapi, California
Replace Bucket Elevator Chute
Design, engineer, manufacture and supply new raw material elevator chute.
Winter 2004
RMC Pacific Materials
Davenport, California
Primary Crusher; Scalping and Screening Station
Design, engineer, manufacture and install conversion for 6 x 20 single deck vibrating bar grizzly; new deck frames, moly-rubber grizzly bars and full rubber wear package. Convert both decks of Allis 8 x 24 DD primary screen with new mining duty deck frames, moly-rubber screen panels and full rubber wear package.
February 2001
TXI, Pacific Custom Materials
Port Costa, California
700HP Cage mill discharge chute
Design, engineer, manufacture and supervise installation of new dust tight collection chute, with new conveyor impact system and conveyor canoe.
November 2000
CEMEX (RMC Pacific Materials)
Davenport, California
Roller Mill Feed System Upgrade
Design, engineer, manufacture, supervise installation & startup of new design non-plugging and airtight feeder to the Triple Gate.
February 2000
RMC Pacific Materials
Davenport, California
Feeder and raw material Air-Lock System (105 feeder)
Design, engineer, manufacture and install new raw material air-lock feeder system for 1750 HP Roller mill; inflatable feed hopper, 48" x 24' belt feeder and air tight hood over triple gates.
February 2000
Graniterock
Watsonville California
Sand Stacker
Design, engineer and manufacture
36" x 150' radial stacker.
April 1999
Graniterock
Watsonville, California
Primary Scalping Screen Conversion
Re-engineer and supply new side frames for 6 x 16 DD scalping screen, complete with new mining duty deck frames and moly-rubber grizzly panels.
March 1999
RMC Pacific Materials
Davenport, California
Triple Gates; (Raymond Roller Mill), Overland Conveyor and high temperature Clinker Handling
Design, engineer, manufacture and install new (patent pending) mill feed-gate system for 1750 HP grinding mill, new hi-temperature ceramic lined windboxes in the roller mill and two additional beltline junctions.
February 1999
Lone Star Northwest
DuPont, Washington (Seattle-Tacoma)
Coarse Material and Crusher Dust Surge Pile Reclaim Feeder Hoppers
Design, engineer and manufacture non-plugging inflatable moly-rubber hoppers, fitted over the tunnels. Hoppers measuring 6' x 8' with 5" thick inflatable liners. Included four-station PLC air controllers.
December 1998 (-7" feed pile)
March 1999 (-#4 mesh crusher dust pile)
Kaiser Sand & Gravel
Cupertino, California
Primary Screens bypass chute
Design, engineer and manufacture inflatable moly-rubber lining system, complete with programmable air controller.
November 1998
Lakeside Industries
Issaquah, Washington
Screen undersize chutes
Design, engineer, manufacture and supervise installation of inflatable moly-rubber liners.
Two systems; September 1998 and June 1999
Lone Star Northwest
DuPont, Washington (Seattle-Tacoma)
2,500 TPH crushing plant; finish screens undersize chutes
Design, engineer, manufacture and supervise installation of four inflatable moly-rubber liner systems under the 8 x 20 sand screens, with programmable inflatable controls.
September 1998 (1st system)
October 1998 (remaining 3 systems)
CalMat
Pleasanton, California
Scrubber Station
Design, engineer, manufacture and install two scrubber discharge chutes.
April 1998
RMC Pacific Materials
Davenport, California
Overland Conveyor (3.5 miles)
Design, engineer, manufacture and supervise installation of three beltline junction chute systems; including slide beds, 36' long canoe sections, ceramic canoe liners, SureSeal skirting and safety access doors.
February 1998
Calmat
Pleasanton, California
Primary Scrubber Station
Design, engineer, manufacture and supervise installation of three new 6' diameter x 33' long primary trommel screens.
May 1997
RMC Pacific Materials
Davenport, California
Primary Crusher Station and overland beltline chutes
Design, engineer, manufacture and supervise installation of three new primary ore chutes.
February 1997
Pegasus Florida Canyon Mining
Imlay, Nevada
R.O.M. Haul Truck Lime Loading System
Design, procure, manufacture and erect turn-key automated lime loading system for CAT 785 (150 ton) haul trucks.
October 1996
Southern Peru Limited (Asarco)
Ilo Smelter, Ilo, Peru
Flux and Reverts Crushing and Loadout System
Consulting services to evaluate existing crushing system. Recommend remedial action required and estimate cost of design, procurement, manufacture and installation of system revisions.
November 1995
At the core, Rockland solves problems for the Mining & Cement industries. Everyone says that — Right? Maybe, but at Rockland we have a proven track record with many clients over many years. Above are just a few areas that may interest you.
Rockland has a long history of satisfied clients that can serve as references.
Rockland solved our grizzly scalping issues handling our 6' shot rock & sticky material.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA
Our new Rockland Triple Gates out-performed even their own 1 year wearlife guarantee.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA
We went from weekly maintenance, to only once a year at overhaul. That chute is so quiet, handling -12" material at 1,200 TPH that it's unbelievable!
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA
After Rockland replaced all 10 chutes on the 3 mile overland beltline, we went an entire year without one neighborhood noise complaint. Problem solved.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA
Our 60 ton raw material surge-bin never again plugged after Rockland designed & installed a new Inflatable Liner Solution.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA
Over the course of 15+ years I have never found a chute wear liner superior to the Rockland custom designed Ceramic & Rubber Liners.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA
When our new Triple Gate was installed, maintenance intervals went from 30 days to three years before we replaced any wear parts.
— Jacob Thompson, Lehigh Southwest Cement, Tehachapi, CA
Our new Air-Lock Belt Feeder solved all of our spillage, constant feed starvation & belt maintenance issues.
— Jacob Thompson, Lehigh Southwest Cement, Tehachapi, CA
The new bucket elevator chute ran for over 4 years before we had to replace any of the rubber liners. It solved all of our spillage
& wear issues.
— Jacob Thompson, Lehigh Southwest Cement, Tehachapi, CA
Our inflatable hopper systems have now been running for years. Solved our plugging & build-up issues.
— Kale Verd, Glacier Northwest, A Calportland Company
The inflatable liner systems in our four screen undersize chutes have operated 9 years without a single liner having to be replaced. And, they solved our build-up issues.
— Kale Verd, Glacier Northwest, A Calportland Company
The first inflatable hopper solved our raw material feeding issues, operating for over 10 years, without failure.
— Kale Verd, Glacier Northwest, A Calportland Company