What We Do

Areas of Expertise:

  • Increase Tonnage
  • Improve Plant Availability & Reliability
  • Enhance Profitability
  • Boost Efficiency
  • Increase Safety Performance Through...
    • Easy Installation
    • Easy Access
    • Easy Maintenance
    • Tool-Less Operation
  • OSHA/MSHA Compliance
    • Governmental Fine Avoidance
    • Elimination of Confined Workplaces
  • Eliminate Spillage
  • Prevent Sticking
  • Contain Dust
  • Reduce Noise
  • Provide for Community Conformity
  • Lower Energy Consumption
  • Increased Wear Life of Screens & Liners
  • Reduce Maintenance Time & Money
  • Improve Screening Efficiency

Project Snapshots:

Owner:

CEMEX

Location:

Sunol, California

Project:

Trommel Screen

Scope:

Increase sand production. Design #4 mesh opening window-frame rubber sand screens.

Completion:

Winter 2010

Owner:

Lehigh Southwest Cement

Location:

Redding, California

Project:

Upgrade Chute System

Scope:

Design, engineer, manufacture and supply new storage dome reclaim transfer chute and conveyor canoe system.

Completion:

Winter 2010

Owner:

Newmont Mining

Location:

Battle Mountain, Nevada

Project:

Upgrade 800 TPH Feeders

Scope:

Design, engineer, manufacture and supervise installation of three feeder system upgrades to increase belt and liner wearlife.

Completion:

Spring 2010

Owner:

Lehigh Southwest Cement

Location:

Tehachapi, California

Project:

Replace Roller Mill Belt Feeder System

Scope:

Design, engineer, manufacture and supply new air-tight 250 TPH belt feeder.

Completion:

Fall-Winter 2009

Owner:

Lehigh Southwest Cement

Location:

Tehachapi, California

Project:

Replace Bucket Elevator Chute

Scope:

Design, engineer, manufacture and supply new raw material elevator chute.

Completion:

Winter 2004

Owner:

RMC Pacific Materials

Location:

Davenport, California

Project:

Primary Crusher; Scalping and Screening Station

Scope:

Design, engineer, manufacture and install conversion for 6 x 20 single deck vibrating bar grizzly; new deck frames, moly-rubber grizzly bars and full rubber wear package. Convert both decks of Allis 8 x 24 DD primary screen with new mining duty deck frames, moly-rubber screen panels and full rubber wear package.

Completion:

February 2001

Owner:

TXI, Pacific Custom Materials

Location:

Port Costa, California

Project:

700HP Cage mill discharge chute

Scope:

Design, engineer, manufacture and supervise installation of new dust tight collection chute, with new conveyor impact system and conveyor canoe.

Completion:

November 2000

Owner:

CEMEX (RMC Pacific Materials)

Location:

Davenport, California

Project:

Roller Mill Feed System Upgrade

Scope:

Design, engineer, manufacture, supervise installation & startup of new design non-plugging and airtight feeder to the Triple Gate.

Completion:

February 2000

Owner:

RMC Pacific Materials

Location:

Davenport, California

Project:

Feeder and raw material Air-Lock System (105 feeder)

Scope:

Design, engineer, manufacture and install new raw material air-lock feeder system for 1750 HP Roller mill; inflatable feed hopper, 48" x 24' belt feeder and air tight hood over triple gates.

Completion:

February 2000

Owner:

Graniterock

Location:

Watsonville California

Project:

Sand Stacker

Scope:

Design, engineer and manufacture
36" x 150' radial stacker.

Completion:

April 1999

Owner:

Graniterock

Location:

Watsonville, California

Project:

Primary Scalping Screen Conversion

Scope:

Re-engineer and supply new side frames for 6 x 16 DD scalping screen, complete with new mining duty deck frames and moly-rubber grizzly panels.

Completion:

March 1999

Owner:

RMC Pacific Materials

Location:

Davenport, California

Project:

Triple Gates; (Raymond Roller Mill), Overland Conveyor and high temperature Clinker Handling

Scope:

Design, engineer, manufacture and install new (patent pending) mill feed-gate system for 1750 HP grinding mill, new hi-temperature ceramic lined windboxes in the roller mill and two additional beltline junctions.

Completion:

February 1999

Owner:

Lone Star Northwest

Location:

DuPont, Washington (Seattle-Tacoma)

Project:

Coarse Material and Crusher Dust Surge Pile Reclaim Feeder Hoppers

Scope:

Design, engineer and manufacture non-plugging inflatable moly-rubber hoppers, fitted over the tunnels. Hoppers measuring 6' x 8' with 5" thick inflatable liners. Included four-station PLC air controllers.

Completion:

December 1998 (-7" feed pile)
March 1999 (-#4 mesh crusher dust pile)

Owner:

Kaiser Sand & Gravel

Location:

Cupertino, California

Project:

Primary Screens bypass chute

Scope:

Design, engineer and manufacture inflatable moly-rubber lining system, complete with programmable air controller.

Completion:

November 1998

Owner:

Lakeside Industries

Location:

Issaquah, Washington

Project:

Screen undersize chutes

Scope:

Design, engineer, manufacture and supervise installation of inflatable moly-rubber liners.

Completion:

Two systems; September 1998 and June 1999

Owner:

Lone Star Northwest

Location:

DuPont, Washington (Seattle-Tacoma)

Project:

2,500 TPH crushing plant; finish screens undersize chutes

Scope:

Design, engineer, manufacture and supervise installation of four inflatable moly-rubber liner systems under the 8 x 20 sand screens, with programmable inflatable controls.

Completion:

September 1998 (1st system)
October 1998 (remaining 3 systems)

Owner:

CalMat

Location:

Pleasanton, California

Project:

Scrubber Station

Scope:

Design, engineer, manufacture and install two scrubber discharge chutes.

Completion:

April 1998

Owner:

RMC Pacific Materials

Location:

Davenport, California

Project:

Overland Conveyor (3.5 miles)

Scope:

Design, engineer, manufacture and supervise installation of three beltline junction chute systems; including slide beds, 36' long canoe sections, ceramic canoe liners, SureSeal skirting and safety access doors.

Completion:

February 1998

Owner:

Calmat

Location:

Pleasanton, California

Project:

Primary Scrubber Station

Scope:

Design, engineer, manufacture and supervise installation of three new 6' diameter x 33' long primary trommel screens.

Completion:

May 1997

Owner:

RMC Pacific Materials

Location:

Davenport, California

Project:

Primary Crusher Station and overland beltline chutes

Scope:

Design, engineer, manufacture and supervise installation of three new primary ore chutes.

Completion:

February 1997

Owner:

Pegasus Florida Canyon Mining

Location:

Imlay, Nevada

Project:

R.O.M. Haul Truck Lime Loading System

Scope:

Design, procure, manufacture and erect turn-key automated lime loading system for CAT 785 (150 ton) haul trucks.

Completion:

October 1996

Owner:

Southern Peru Limited (Asarco)

Location:

Ilo Smelter, Ilo, Peru

Project:

Flux and Reverts Crushing and Loadout System

Scope:

Consulting services to evaluate existing crushing system. Recommend remedial action required and estimate cost of design, procurement, manufacture and installation of system revisions.

Completion:

November 1995

At the core, Rockland solves problems for the Mining & Cement industries. Everyone says that — Right? Maybe, but at Rockland we have a proven track record with many clients over many years. Above are just a few areas that may interest you.

Rockland has a long history of satisfied clients that can serve as references.

Rockland solved our grizzly scalping issues handling our 6' shot rock & sticky material.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA

Our new Rockland Triple Gates out-performed even their own 1 year wearlife guarantee.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA

We went from weekly maintenance, to only once a year at overhaul. That chute is so quiet, handling -12" material at 1,200 TPH that it's unbelievable!
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA

After Rockland replaced all 10 chutes on the 3 mile overland beltline, we went an entire year without one neighborhood noise complaint. Problem solved.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA

Our 60 ton raw material surge-bin never again plugged after Rockland designed & installed a new Inflatable Liner Solution.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA

Over the course of 15+ years I have never found a chute wear liner superior to the Rockland custom designed Ceramic & Rubber Liners.
— Tony Ross, Lehigh Southwest Cement Company, Redding, CA

When our new Triple Gate was installed, maintenance intervals went from 30 days to three years before we replaced any wear parts.
— Jacob Thompson, Lehigh Southwest Cement, Tehachapi, CA

Our new Air-Lock Belt Feeder solved all of our spillage, constant feed starvation & belt maintenance issues.
— Jacob Thompson, Lehigh Southwest Cement, Tehachapi, CA

The new bucket elevator chute ran for over 4 years before we had to replace any of the rubber liners. It solved all of our spillage
& wear issues.

— Jacob Thompson, Lehigh Southwest Cement, Tehachapi, CA

Our inflatable hopper systems have now been running for years. Solved our plugging & build-up issues.
— Kale Verd, Glacier Northwest, A Calportland Company

The inflatable liner systems in our four screen undersize chutes have operated 9 years without a single liner having to be replaced. And, they solved our build-up issues.
— Kale Verd, Glacier Northwest, A Calportland Company

The first inflatable hopper solved our raw material feeding issues, operating for over 10 years, without failure.
— Kale Verd, Glacier Northwest, A Calportland Company